Add a service
Service requests are part of the Core plan.Core plan Owners, admins, and managers keep the list under Requests, on the Services tab.
- Choose + Add service. Enter the name and how it is priced: per sample, per hour, or per request.
- Enter a price for each price group. A group left blank pays the external price. Add the usual turnaround in days if you want requesters to see it.
- Under Questions on the request, add what you need to know. A question can show only when an earlier choice or yes-or-no question has a given answer, such as an IRB number when the organism is human.
- For a service priced per sample, add columns under Details for each sample, such as tissue or fixative.
- Under Stages of the work, list the steps the work goes through, with a target in days for each (see Stages and progress).
- In a workspace with more than one facility, choose the Facility that does the work. With one facility, every service is its own.
- Under Reagents from stock, list the stock items the work uses and how much (see Reagents).
- Under QC checks, list the checks the work usually has, one per line, such as Protein amount and Peptide yield (see Quality control).
- Under Statements to sign, add any terms the requester must agree to, such as storage terms (see Statements to sign).
- Leave Offered ticked so people can request it, then save.
Each request keeps the questions, stages, and price it was sent with, so later changes to the service never alter it.
Send a request
- Open Requests and choose + New request.
- Choose the service, say what the work is for, and answer its questions.
- List the samples one by one; choose Paste a list and paste rows from a spreadsheet, the sample name first, then the sample columns in order; or choose Upload a sample sheet (see Sample sheets). For a service priced by the hour, enter the hours you expect instead.
- Choose the project, or type the paying account, and choose Send request. The estimated charge is shown before you send. A service with statements asks you to read them and type your full name, and the button reads Sign and send request.
Members, managers, admins, and owners can send requests. Researchers see only their own requests.
A request charged to a project can wait for approval first, such as the PI's (see Approvals).
Approvals
A request can need approval before the core sees it. It shows as Awaiting approval until every step is done.
| Step | When it applies | Who approves |
|---|---|---|
| Project approval | The project the request is charged to has an approver, such as the PI, and someone else sent the request. | The project’s approver, or a workspace manager |
| Budget approval | The request would pass the project’s budget, and the project sends it for manager approval. | A workspace manager |
- The approver is emailed. In Requests, they choose Waiting for my approval and open the request. It shows the project, the estimated charge, and the budget with this request counted.
- They choose Approve, or Do not approve with a reason.
After the project approval, the budget is checked again. If the budget was raised or other work was cancelled, the budget step is skipped. A workspace manager who approves the project step approves the budget too. Once every step is done, the request is Submitted and the core is emailed. The requester is emailed after each step.
A request that is not approved closes with the reason, shows as Not approved, and is not charged. While it waits, the requester can cancel it and the core can reject it.
Statements to sign
A service can ask the requester to sign up to 5 statements as they send a request, such as storage terms, how samples from people were collected, or how released samples will be used. Add them in the service under Statements to sign: a title and the full text for each, up to 2,000 characters.
- The request form shows each statement in full, then Your full name.
- The requester types their name as it is on their ConductScience account and chooses Sign and send request. Case, extra spaces, and accents do not matter. An account without a name takes any name of 2 or more characters.
| Question | Answer |
|---|---|
| What is kept? | The statements as they were shown, the name typed, the requester’s email, the time, and a SHA-256 digest of those facts with the request’s number. A signature never changes once saved, and later changes to the service leave sent requests alone. |
| Who signs? | Only the person who sends the request. Staff cannot send a request for a researcher when its service has statements. |
| Who sees it? | Everyone who sees the request: the requester, the project’s approver, and the core. The request shows who signed, their email, the time, and each statement. |
| Where else does it show? | The core’s email about the new request names the statements signed, and the request’s history has the step Statements signed. |
Sample sheets
A sample sheet is a CSV or Excel (.xlsx) file with one sample per row, up to 500. Use one for a long list, or when your samples are already in a spreadsheet.
- In + New request, under the samples, choose Upload a sample sheet. Download a template gives you a file with the service's columns, the sample name or ID first.
- Choose the file. Each column is matched to a sample column by its name, in any order. Change a match under Use as, or choose Leave out. Untick The first row has the column names if the file starts with a sample.
- Check the rows. Each sample is checked the way the core checks it: required columns filled, numbers as numbers, choices from the list, and real dates. Names used more than once are pointed out.
- Choose Use with the number of samples to fill the sample list. It replaces the samples listed before. Fix anything still marked in the list, then send the request.
Who works on requests
The core for a request is the workspace's owners, admins, and managers, and the managers and staff of the facility that does the service. Give a technician the Staff role in that facility, under Facilities, and they can work its requests. They do not need to be workspace managers.
| Person | What they see and do |
|---|---|
| Owner, admin, or workspace manager | Sees every request and does everything below, plus the service list, budget overrides, and reports. |
| Facility manager or staff | Sees their own requests and every request for their facility’s services. Reviews, asks questions, sends estimates, approves, starts, marks stages, moves samples, logs time, records supplies used, adds and releases results, adds and shares files, bills milestones, completes, cancels, rejects, assigns, and adds internal notes. Facility managers also log and correct time for others. |
| Researcher | Sees their own requests. Sends them, answers questions, accepts or declines estimates, cancels before work starts, adds files while the request is open, and reads released results and shared files. |
| Project approver, such as the PI | Also sees the requests charged to the projects they approve, with their released results and shared files, and approves or declines them. |
Facility managers and staff are emailed about new requests for their facility, answers to the core's questions, accepted and declined estimates, and cancellations. A request can be assigned to any of them; the person assigned is emailed. Staff can also send a request for a researcher, for example when samples are dropped off, except for a service with statements to sign.
How a request moves
| Status | What it means | Who acts next |
|---|---|---|
| Awaiting approval | The request waits for its project’s approver, or for a workspace manager when it passes the budget (see Approvals). | The approver: Approve or Do not approve |
| Submitted | The request is new. The core is emailed. | The core: its first step opens the request for review |
| In review | The core is reading it. | The core: Approve, Send an estimate, Ask for information, or Reject |
| Awaiting information | The core asked a question, and the requester is emailed. | The requester answers, and can correct their answers at the same time |
| Estimate sent | An estimate with its lines and total waits for the requester. | The requester accepts or declines that revision |
| Approved | The amount is set: the estimate accepted, or the price times the quantity sent. | The core: Start work |
| In progress | The core is doing the work. | The core: Complete |
| Completed | The charge goes on the next invoice. | Nobody |
| Cancelled, rejected, or not approved | Closed with a reason. Nothing is charged. | Nobody |
A new estimate is a new revision; earlier ones stay as they were sent. An estimate sent after approval replaces that approval until the requester accepts the new revision. Completing can charge the approved amount or less, never more; for a request billed by the hour without an estimate, the core enters the hours used, which start from the billable time logged (see Staff time).
The requester can cancel a request until the work starts. After that, the core cancels it.
Stages and progress
Stages are the steps of the work, such as Received, Processing, Embedding, Sectioning, Staining, and Delivered. A service can have up to 12. Each has an optional target in days, and you can choose Email the requester when it is done for the stages a requester cares about.
Open a request to see its Progress: how many stages are done, the stage the work is at now, and the expected finish. The expected finish starts from the current stage's start (or today) and adds the targets of the stages left. A stage still open past its target is marked Late, on the request and in the list.
| Button | What it records |
|---|---|
| Done | The stage finished on the date chosen. If it was the stage in progress, the next stage starts the same day. |
| Start, or Change start date | The stage started on the date chosen: a stage started early, or a start corrected on a stage in progress. |
| Not needed | The stage is skipped. If it was the stage in progress, the next stage starts. |
| Reopen | Takes back Done or Not needed. |
Marks use today's date where the core is, unless you choose an earlier day in Date of the change. A date cannot be in the future, and a stage cannot be done before it started. Stages can be marked out of order. Only the core marks stages; the requester sees the stages and their dates, and the core also sees who marked each one.
Stages do not move a request to In progress or Completed: Start work and Complete still do. A completed request's stages can still be finished; a cancelled or rejected request's stages stay as they were.
Samples
Samples are listed on the request with their details, their stage, and a status: not received, received, done, or failed. The core selects samples and marks a status, or chooses a stage under Move to and chooses Move.
A sample is with the request until it is moved, and shows the stage the work is at. A moved sample keeps its own stage, ahead or behind, and shows Own stage. When a stage is marked done or not needed, the samples at that stage go on with the request; samples held at an earlier stage stay there. Choose With the request to put a sample back with the rest.
Print sample labels prints a sheet with a QR code for each sample.
Completed requests are billed on the monthly invoices; Bill for use and services explains how.
Reagents
A service can list the stock it uses, such as hematoxylin, eosin, and slides for H&E staining. Each reagent has an amount per sample, per hour, or per item, as the service is priced, or one amount per request. The items come from the workspace's stock under Supplies.
- Open the service, and under Reagents from stock choose + Add reagent.
- Choose the item, enter the amount in the item's unit, such as 0.5 for 0.5 mL, and choose what it is for. Save.
- When you choose Complete on a request, Reagents from stock lists each amount for that request: 0.5 mL per sample for 12 samples is 6 mL. Change any amount that differs from what was used, or untick Draw these reagents from stock.
Completing the request takes the amounts from stock, the lot that expires first first, and the request shows Reagents drawn. Each draw is in the item's stock history with the request number. Reagents are not charged to the requester: the service price covers them. Supplies charged separately go under Supplies used.
Staff time
Open a request and use Log time under Time to record work on it: the day, the hours and minutes, the stage, and an optional note. The day is today where the core is unless you choose an earlier one, and one entry holds at most 24 hours. Time can be logged in any status, a cancelled request included, because it records work done rather than a charge.
| Question | Answer |
|---|---|
| Who logs time? | Anyone who works on the request logs their own. Facility managers and workspace owners, admins, and managers can log it for anyone who works on the request, under Who did the work. |
| Who changes or deletes an entry? | The person who did the work, the person who logged it, and facility managers and workspace managers. |
| Who sees it? | The core only. The requester never sees time entries. |
| Is it billed? | Only on a request priced by the hour without an estimate. Tick Billable on the time that counts; Complete then starts from the billable time, to the nearest quarter hour. You can change the hours before completing, and the charge still cannot pass the approved amount. |
Owners, admins, and managers can report on time under Reports: choose Staff time and group the hours worked or billable hours by person, service, stage, project, month, quarter, week, or billable. Each entry counts on the day it was worked. Every entry, change, and deletion is in the activity log.
Instrument time for a request
When the core does a request's work on a bookable instrument, such as two days of cryo-EM collection, reserve the time from the request so the instrument is held for it:
- Open the request. Under Instrument time, choose Reserve instrument time.
- Choose the Instrument and who it is Run by. The request's assignee is chosen to start with, or you if it has none.
- Set the Start and End, in your time zone, and choose Reserve time.
| Question | Answer |
|---|---|
| Who reserves it? | Workspace owners, admins, and managers, and the managers and staff of the facility that does the work, on instruments in a facility they work in. The request must still be open. |
| Who runs it? | A workspace owner, admin, or manager, or a manager or staff member of the instrument’s facility, trained on the instrument when it requires training. They must be free then: not staff on another session, booked on one, or leading a training session. |
| How is it held? | As a confirmed session in the name of the person running it, with the instrument’s setup and cleanup time, checked in and out like any session. It needs no approval, and the booking limits for researchers do not apply. |
| How is it billed? | On the request, as the request is priced. The session itself has no charge and never goes on a statement. |
| Who sees it? | Everyone who sees the request sees the instrument, the time, and who runs it. The core also sees it on Schedule, with a link to the request. |
| How is it changed? | Choose Cancel this time on the request, with a reason, or open the session on Schedule to move it, change who runs it, or cancel it. The person running it is emailed about each change they did not make. |
Reserving and cancelling instrument time are steps in the request's history.
Files on a request
Keep a request's documents with it: a sample sheet or consent form from the requester, and reports, tables, and figures from the core. Each file can be up to 4 MB. For larger data, such as sequencing reads, add a result link to where it is stored.
- Open the request. Under Files, choose a file, add a note if it helps, and choose Add file.
- A file with the same name as one on the request, in any case, is saved as its next version. Earlier versions stay listed under Earlier versions.
- The core's files stay with the core until it chooses Share with requester. Stop sharing takes a file back.
| Question | Answer |
|---|---|
| Who adds files? | The requester, until the request is completed, cancelled, or rejected. The core at any time: workspace owners, admins, and managers, and the managers and staff of the facility that does the work. |
| Who sees them? | The core sees every file and who added it. The requester and the project’s approver see the requester’s files and the files the core shares. A file the requester adds reaches the core at once and stays shared with them. |
| Who is emailed? | The core, when the requester adds a file to a request that has reached the core. The requester, when the core shares a file. Emails never carry the file or its name. |
| Who deletes a version? | The core, any version. The requester, the versions they added, while the request is open. A deleted version is gone for good, and its number is not used again. |
| How much fits? | 100 files on a request, every version counted, and 250 MB across all the requests in a workspace. |
| How do files open? | Always as a download, never as a page in the browser. |
Adding, sharing, taking back, and deleting a file are steps in the request's history, with the file's name and version.
Milestones
For long work, such as a bioinformatics project, bill part of the approved charge before the work is complete: a deposit at the start, or each phase as it is delivered. Completing the request charges the rest.
- Open the approved request. Under Milestones, name the milestone, such as Deposit or Analysis delivered, enter the amount, and choose Bill milestone.
- The milestone goes on the payer's next statement, in the period it was billed. The requester is emailed the amount.
- When the work is done, complete the request as usual. Its statement line is the balance after milestones.
| Question | Answer |
|---|---|
| When can a milestone be billed? | Once the request is approved, until it is complete. Together, milestones bill at most the approved amount. |
| Who bills them? | The core: workspace owners, admins, and managers, and the managers and staff of the facility that does the work. |
| Who sees them? | Everyone who sees the request sees each milestone, its amount, and the invoice it is on. |
| Can one be taken back? | Yes, with Take back, until a billing run puts it on a statement or the request is complete. After that, correct the statement line with an adjustment. |
| What about completing and new estimates? | The final amount must cover the milestones billed, and a new estimate cannot total less than them. |
| What if the request is cancelled? | Milestones already billed stay billed. Take back any that should not be charged, before or after you cancel, while they are not on a statement. |
Billing and taking back a milestone are steps in the request's history, with its name and amount.
Quality control
A QC result records a check, such as peptide yield or a QC standard, as pass or fail, with an optional value and note, on the day it was done. Record it on a request, for each sample or the whole request, or on an instrument.
On a request:
- Open the request. Under Quality control, choose one of the checks listed or type the name of the check.
- Choose the day, today where the core is unless you choose an earlier one, and whether the results are for Each sample or The whole request.
- Mark each sample Pass or Fail, with a value such as 12 µg and a note if needed, or choose Mark all pass and change the samples that failed. Samples left as Not checked are not recorded. Choose Record QC.
The checks listed are the service's QC checks, then the names used on its requests before. Results are grouped by check and day. The requester and the project's approver see them, without who recorded them. QC can be recorded in any status except cancelled or rejected, a completed request included.
On an instrument, open its page and choose Record QC. Name the check, choose Pass or Fail, and add a value or a note. Under A pass also records, a passing check can record one of the instrument's maintenance plans as done, such as Run the QC standard, which sets its next due date. Everyone who sees the instrument sees its latest results, and the last one at the top of the page.
| Question | Answer |
|---|---|
| Who records QC? | On a request, anyone who works on it: workspace owners, admins, and managers, and the managers and staff of the facility that does the work. On an instrument, the managers and staff of its facility, and workspace owners, admins, and managers. |
| Who removes a result? | The person who recorded it, the facility’s managers, and workspace owners, admins, and managers. |
| Who is emailed? | A failed check on an instrument emails the workspace owners, admins, and managers and the facility’s managers, except the person who recorded it. QC on a request sends no email; send the requester a message when a sample fails. |
| How is it reported? | Under Reports, choose Build a report and QC results. Group the share passed, the failed checks, or the count by check, instrument, service, result, person, month, quarter, or week. Each result counts on the day of the check. |
Request QC is part of the Core plan.Core plan Every result, and every removal, is in the activity log.
Request history and the activity log
Every step on a request is saved with who took it and when: sent, statements signed, approved for the project or past its budget, opened for review, more information asked for and given, each estimate sent, accepted, or declined, assigned, samples marked or moved, each stage, staff time, QC results, results added, released, or withdrawn, files added, shared, taken back, or deleted, milestones billed or taken back, and completed, cancelled, or rejected.
On a request, open History to read its steps, oldest first, with the amount, the reason, or the result's name where a step has one. The history is for the people who work on the request: workspace owners, admins, and managers, and the managers and staff of the facility that does the work. The requester and the project's approver do not see it.
Owners, admins, and managers see every change in the workspace under Integrations, Activity log, newest first. To keep a copy, choose the first and last day, and a kind of record under Show to keep only that kind, then choose Download CSV.
| Column | What it holds |
|---|---|
| When | The time in the core’s time zone, with its offset from UTC, such as 2026-10-31T14:05:09-04:00. |
| Who and Email | The person who made the change, or Automatic for the app’s own jobs. |
| What | The change in words, such as SR-0004: estimate sent. |
| Type, Action, and Record | The kind of record, the change’s name in the app, and the record’s ID. |
| Details | Everything saved with the change, such as an amount or a reason. |
The days are in the core's time zone, both included, and one file holds up to 10,000 entries. Each download is itself in the activity log.
Throughput reports
Owners, admins, and managers see the core’s throughput under Reports. The overview has Requests completed, Samples completed, and a Throughput by service table for the period, with a total row. Download CSV saves the table for funding reports and annual reviews.
| Number | How it is counted |
|---|---|
| Requests completed | Requests marked complete in the period, on the day they were completed where the core is. |
| Samples | The samples on each request that were not marked Failed. A per-sample request without a sample list counts the samples it billed. |
| Failed samples | Samples marked Failed on the completed requests. |
| Average and median turnaround | Days from when the request was sent to when it was completed. |
| Within target | The share of requests finished within their service’s turnaround, using the turnaround the service has now. Services without a turnaround are left out. |
| People and PIs served | Each requester, and each PI named on a project, counted once, however many requests they had. |
To group the same numbers another way, use Build a report and choose Completed requests, then group by service, person, PI, project or account, price group, month, or quarter. Choose Request stages to see each stage done in the period, counted on the day it was marked done: stages done, average and median days at the stage, the share done within the stage’s target, and late stages, by service, stage, month, or quarter. Stages marked not needed are left out.
The monthly summary email to core managers includes the requests completed, their samples, and the median turnaround.