Skip to content
ConductCommonsStart free

Equipment maintenance

Laboratory equipment maintenance

Keep a maintenance plan, repair history, and QC record for each instrument, and tell people when one goes down. It is free for labs and core facilities. Only the reports need the Core plan.

What is due on each instrument

Pick an instrument and mark its maintenance done. The next due date moves forward.

Instrument status

Updated 10:42 AM on Oct 13; refreshes every minute.

  • 1 in use
  • 1 booked
  • 1 training
  • 1 down
  • 2 free
  • Booking rules

    Training
    Needed before booking
    Approval
    Not needed
    Session
    30 minutes to 8 hours
    Charged for
    Actual usage, check-in to check-out

    Preventive maintenance

    Managers are emailed before each one is due.

    • Daily QC with beads

      every day · next due Oct 14

    • Weekly fluidics cleaning

      every week · next due Oct 18

    • Preventive maintenance visit

      every 6 months · next due Dec 16

Example data.

Preventive maintenance

Plans and reminders for each instrument

Preventive maintenance

Name the service, how often it repeats in days, and when it is next due.

Maintenance plans

4 plans

  • Daily QC with beads

    every day

    Due Oct 18
  • Weekly fluidics cleaning

    every week

    Due Oct 22
  • Preventive maintenance visit

    every 6 months

    Due Nov 8
  • Biosafety cabinet certification

    every year

    Due Dec 19
Example data.

Managers get an email before a plan is due. Choose how many days before.

Maintenance due: 2 items in Example Flow Cytometry Core

To the core's managers

  • Flow cytometer 1: Weekly fluidics cleaning

    Due Oct 20 · reminder 1 day before

  • Flow cytometer 1: Preventive maintenance visit

    Due Oct 27 · reminder 14 days before

Example data.

Enter the date and any notes, and the next due date updates. A plan past its date is marked Overdue.

Weekly fluidics cleaning

Flow cytometer 1 · every 7 days

Done on (blank for today)

Oct 13

Notes (optional)

Done as planned

Weekly fluidics cleaning recorded. The next one is in 7 days.

  • Preventive maintenance visit

    Every 182 days · overdue since Oct 11

    Overdue
Example data.

Record each check on an instrument with its result. A passing check can count as the maintenance due, so nobody enters it twice.

Flow cytometer 1

QC checks

  • Daily QC with beads

    Oct 24, 8:05 AM · Elena Rossi

    Pass
  • Daily QC with beads

    Oct 23, 8:12 AM · Marcus Lee

    Pass

Everyone who books Flow cytometer 1 sees the last result.

Example data.

Records

Each instrument keeps its status, calibration and service dates, and maintenance and repair logs.

Equipment

6 instruments

NameNext calibrationStatus
Flow cytometer 1Nov 15Active
Flow cytometer 2Dec 7Active
Spectral flow cytometerJan 2Active
Cell sorterFeb 16Active
Example data.

Core plan

Core facilities on the Core plan can run reports on problems, repair costs, and hours down by instrument.

Hours down by instrument

Downtime, this year

  • Flow cytometer 172 hours
  • Flow cytometer 240 hours
  • Spectral flow cytometer18 hours
  • Cell sorter6 hours
Example data.

Keeping a log at the bench? Download the free equipment maintenance log template or the autoclave log sheet.

See pricing

Repairs and downtime

Problem reports, repairs, and taking an instrument down

Repairs

Anyone can report a problem from the instrument page or a booking.

Flow cytometer 1

Problem reports and downtime

Down
  • Error on startup

    Marcus Lee · Oct 15, 2:15 PM

    In repair
  • Managers emailed

    Oct 15, 2:15 PM

  • Down until Thu 9:00 AM

    2 bookings cancelled, and both people told

Example data.

Follow each report from open to in repair to resolved, with labor hours, parts and labor costs, and what was done.

Error on startup

Flow cytometer 1 · Marcus Lee · Oct 15, 2:15 PM

Resolved

Status

Resolved

Labor hours

6

Parts (USD)

420.00

Labor (USD)

310.00

What was done

Replaced the power supply and ran a full check.

Example data.

Each instrument shows its typical repair time and repairs this year, so you can spot one worth replacing.

Flow cytometer 1

Care record

Working
  • Typical repair

    6 h over 3 repairs this year

  • Parts and labor

    $1,240.00 this year

  • Problem reports

    No open problems

Example data.

Downtime

Set the reason and end time. You see the reservations it would cancel before you confirm, and the people who booked are told.

Flow cytometer 1

Take it down until Oct 22, 9:00 AM · Repair visit

2 reservations are in the way. Nothing has changed yet.

  • Priya Shah

    Oct 20, 9:00 AM to 11:00 AM

    Reserved
  • Marcus Lee

    Oct 21, 1:00 PM to 3:00 PM

    Reserved
Example data.

Link a plate loader to its cytometer. When the cytometer goes down, the loader goes down too, so nobody books it.

Flow cytometer 1

When this instrument goes down, its parts go down too.

  • Plate loader

  • Analysis workstation

Example data.

Hold time on the schedule for a service visit.

Schedule

Oct 20

  • Flow cytometer 1

  • Flow cytometer 2

  • Spectral flow cytometer

  • Booked
  • Training
  • Maintenance
Example data.

Start a maintenance record for each instrument.

Tracking maintenance, problems, repairs, and downtime is free.