Skip to content
ConductCommonsStart free

Requests, queues, and QC for mass spectrometry cores

Take quantification, accurate mass, GC-MS, ICP-MS, and MALDI-TOF requests with sample sheets, run a walk-up LC-MS queue, record pass or fail QC on samples and instruments, and bill the work.

A secondary ion mass spectrometer in a lab.

Set up as a mass spectrometry core

Setup adds 12 instruments, 8 services, and 28 maintenance plans.

Follow a request through the core

Pick a service, send the request, and take it through to the invoice.

New request

Targeted quantification (LC-MS/MS)

The compounds you choose, such as drugs, hormones, lipids, or neurotransmitters, measured by LC-MS/MS against a calibration curve with internal standards. You get the amount of each in each sample.

Sample name or IDGroupVolume or massNotes

Paste rows from a spreadsheet, or add them one at a time.

Estimated charge $1,080.00

$45.00 per sample × 24 samples.

This brings Aging cohort to $9,080.00 of its $10,000.00 budget.

Example data.

Who it is for

Mass spectrometry cores

A mass spectrometry core runs staff work by request, from method development to quantification, and keeps a walk-up instrument for chemists, with QC on every batch and every instrument. ConductCommons keeps each request with its samples, QC results, stages, staff time, standards, and bill, and each instrument with its queue, QC, maintenance, and problems.

What comes set up for a mass spectrometry core

12instruments

8services

28maintenance plans

See every instrument, service, and plan

Instruments12

  • Triple quadrupole LC-MS/MS (2)

  • Mass spectrometer

  • GC-MS system

  • ICP-MS system

  • MALDI-TOF mass spectrometer

  • Open-access LC-MS

  • HPLC system

  • Nitrogen evaporator

  • Centrifuge

  • Data processing workstation (2)

Services8

  • Targeted quantification (LC-MS/MS)

    per sample, about 14 days, 6 stages

  • Accurate mass (HRMS)

    per sample, about 3 days, 4 stages

  • Compound identification

    per sample, about 10 days, 5 stages

  • GC-MS analysis

    per sample, about 10 days, 5 stages

  • Elemental analysis (ICP-MS)

    per sample, about 10 days, 5 stages

  • MALDI-TOF analysis

    per sample, about 3 days, 4 stages

  • Method development

    by the hour

  • Mass spectrometry data analysis help

    by the hour

Maintenance plans28

  • Run the system suitability standard

    every week, on 3 instruments

  • Mass calibration

    every week, on 3 instruments

  • Tune and calibrate

    every month, on 2 instruments

  • Clean the ion source

    every month, on 4 instruments

  • Autotune

    every week, on 1 instrument

  • Change the inlet liner and septum

    every month, on 1 instrument

  • Run the performance check

    every week, on 1 instrument

  • Clean the cones

    every month, on 1 instrument

  • Purge the pumps and check the pressure

    every month, on 2 instruments

  • Archive raw files and clear space

    every month, on 2 instruments

  • Preventive maintenance visit

    every year, on 8 instruments

You can also download free request forms and maintenance logs for this kind of core.

What the core runs

The instruments behind the work

Choose Mass spectrometry when you set up the core, and these open with their booking rules and the walk-up queue, along with eight services with their stages and usual QC checks, and the maintenance plans. Change anything later, and add any instrument your core shares. Pick an instrument to see its booking rules and maintenance plans.

Instrument status

Updated 10:42 AM on Oct 13; refreshes every minute.

  • 1 in use
  • 1 booked
  • 1 training
  • 1 down
  • 8 free
  • Booking rules

    Training
    Needed before booking
    Approval
    A manager approves each reservation
    Session
    1 hour to 3 days
    Charged for
    Actual usage, check-in to check-out

    Preventive maintenance

    Managers are emailed before each one is due.

    • Run the system suitability standard

      every week · next due Oct 19

    • Tune and calibrate

      every month · next due Oct 31

    • Clean the ion source

      every month · next due Oct 24

    • Preventive maintenance visit

      every year · next due Jun 26

Example data.
  • Triple quadrupole LC-MS/MS

    Run by staff for targeted quantification, with system suitability, tuning, and source cleaning on the calendar

  • High-resolution mass spectrometer

    Accurate mass and compound identification, with a weekly mass calibration

  • GC-MS, ICP-MS, and MALDI-TOF

    Fatty acids and volatiles, trace elements, and the mass of proteins, peptides, and polymers

  • Walk-up LC-MS

    Chemists queue their own samples after training, with a night queue for long runs

  • Sample preparation and data

    HPLC, nitrogen evaporator, centrifuge, and two data processing workstations

How it fits mass spectrometry work

From the sample to the result that goes back

Before the work

Core plan

Researchers name the compounds and sample type, then list samples with group and amount.

Targeted quantification (LC-MS/MS)

24 samples, every row checked

Sample name or IDGroupVolume or mass
S-01Control100 µL
S-02Control100 µL
S-03Treated100 µL

and 21 more samples

Example data.

Trained chemists add samples with the minutes each needs. Longer runs wait for the night hours you set.

Runs today

Up to 15 minutes by day. Longer runs wait for 7 PM to 7 AM.

  • Priya Shah, 20 minutes

    Running now
  • Marcus Lee, 25 minutes

    Next
  • Sam Okafor, 3 hours

    Night queue
Example data.

During the work

Core plan

Each stage has a target in days. Researchers see where their samples are and when the results should arrive.

Targeted quantification (LC-MS/MS)

SR-0042 · Chen Lab

In progress
  • Received

    Done
  • Method setup

    Target 3 days

    Done
  • Extraction

    Target 3 days

    In progress
  • LC-MS/MS

    Target 4 days

    Not started
  • Quantification

    Target 3 days

    Not started
  • Delivered

    Not started
Example data.

Core plan

Staff record each check with a value, for each sample or the whole request.

QC

SR-0042 · Targeted quantification (LC-MS/MS)

  • Calibration curve

    24 of 24 samples

    Pass
  • QC sample accuracy

    Whole request

    Pass
  • Carryover blank

    Whole request

    Pass

Recorded by Elena Rossi, Oct 15

Example data.

Core plan

Staff log their time by stage. Method development bills by the hour from the time logged.

Staff time

SR-0042 · Assigned to Elena Rossi · Due Oct 26

  • Method setup1.5 hours
  • Extraction6 hours
  • LC-MS/MS4 hours
  • Quantification2 hours
Example data.

Core plan

Supplies come out of stock when a request is done. Managers are emailed at the reorder point.

Taken from stock

Completed requests, Oct 15

  • Internal standard mix

    per request

    Taken
  • Derivatization reagent

    per sample

    At reorder point
Example data.

After the work

Core plan

Requests charged to a project can wait for its PI. Completed requests and queued runs go on one monthly statement.

INV-0014

Chen Lab · Aging cohort

  • Targeted quantification (LC-MS/MS)

    12 samples at $45.00

    $540.00
  • Accurate mass (HRMS)

    24 samples at $45.00

    $1,080.00
  • Compound identification

    6 samples at $45.00

    $270.00

Total (USD)$1,890.00

Example data.

Core plan

See turnaround, staff hours, and QC pass rates. Download any table as CSV for funding reports.

Turnaround by service

Average days, this year

  • Targeted quantification (LC-MS/MS)14 days
  • Accurate mass (HRMS)3 days
  • Compound identification10 days
  • GC-MS analysis10 days
Example data.

On the instruments

Record each system suitability run with its result. A failed check emails the managers.

Triple quadrupole LC-MS/MS 1

QC checks

  • Run the system suitability standard

    Oct 24, 8:05 AM · Elena Rossi

    Pass
  • Run the system suitability standard

    Oct 17, 8:12 AM · Marcus Lee

    Pass

Everyone who books Triple quadrupole LC-MS/MS 1 sees the last result.

Example data.

Managers are reminded of source cleaning, ICP-MS cones, and service visits. Downtime tells the people booked.

Maintenance plans

11 plans

  • Run the system suitability standard

    every week

    Due Oct 18
  • Mass calibration

    every week

    Due Oct 22
  • Tune and calibrate

    every month

    Due Nov 8
  • Clean the ion source

    every month

    Due Dec 19
Example data.

Questions

Mass spectrometry core questions

Can chemists run their own samples?

Yes. After training, they add samples to the walk-up LC-MS queue with the minutes each needs. Runs go in order, one at a time, around reservations, and runs longer than the limit you set wait for the night queue. Each run is billed like a session for the minutes it takes.

Can we record QC on each batch?

Yes. Staff choose a check, such as the calibration curve or QC sample accuracy, and mark each sample pass or fail with a value and a note, or record one result for the whole request. Each service lists its usual checks to choose from. The researcher sees the results on the request.

How is method development billed?

By the hour. Staff log their time on the request by stage, and the hours are billed at the rate for the researcher’s price group. The staff time report shows the hours by person, stage, and service.

How do we report productivity and quality?

Reports show the requests and samples completed and the turnaround for each service, staff hours by person and stage, and QC pass rates by check, instrument, and month, for any period. Download any table as CSV.

Does it work with our finance system?

Completed requests, queued runs, and sessions go on a monthly statement for each project or account, locked once final. The journal file lists each finalized line against the payer’s account and your revenue account, for the business office to post.

Run your mass spectrometry core in one place.

Every new workspace includes the Core plan for 30 days. After that, booking stays free; rates, invoices, and service requests need the Core plan.

Photo credits